Lead time considerations for the multi-level capacitated lot-sizing problem

delete2015-03-01
delete40
delete
OA
AI
C
Christian Almeder *
D
Diego Klabjan
R
Renate Traxler
B
Bernardo Almada‐Lobo
DOI:10.1016/j.ejor.2014.09.030delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
The classical multi-level capacitated lot-sizing problem formulation is often not suitable to correctly capture resource requirements and precedence relations. Depending on lead time assumptions, either the model provides infeasible production plans or plans with costly needless inventory. We tackle this issue by explicitly modeling these two aspects and the synchronization of batches of products in the multi-level lot-sizing and scheduling formulation. Two models are presented; one considering batch production and the other one allowing lot-streaming. Comparisons with traditional models demonstrate the capability of the new approach in delivering more realistic results. The generated production plans are always feasible and cost savings of 30-40 percent compared to classical models are observed. (C) 2014 Elsevier B.V. All rights reserved.
Keyword:
Production
Lot-sizing
Scheduling
Mixed integer programming
Synchronization
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

European Journal of Operational Research 封面图
European Journal of Operational Research
IF:
6
论文数:
2.2W
被引数:
6.4W

机构

E
european university viadrina frankfurt oder
学者数:
230
论文数: 269
被引数: 1
I
INESC TEC
学者数:
1.5K
论文数: 1.4K
被引数: 1.7K
N
Northwestern University
学者数:
6.2W
论文数: 5.3W
被引数: 3.9K
学者 查看更多机构
引用论文

引用论文

Mutation of the INI1 gene in composite rhabdoid tumor of the endometrium
err2007-06-01
err0
errOAAI
errLudvik R. Donner; Luanne M. Wainwright; Fan Zhang; Jaclyn A. Biegel
err分享
err收藏
Lot sizing and scheduling: industrial extensions and research opportunities
err2011-05-01
err68
PREAI
errClark, Alistair; Almada-Lobo, Bernardo; Almeder, Christian
err分享
err收藏
学者 查看更多内容