返回
Linear Decision Rules for Hydropower Scheduling Under Uncertainty
DOI:10.1109/TPWRS.2016.2555360.png)
摘要
En 中文
We investigate the hydropower scheduling problem, in which a price-taking producer determines a reservoir management strategy that maximises the present value of revenues from selling the produced electricity in a well-functioning market. Uncertainty is present both in market prices and in reservoir inflows. To solve the problem, we apply linear decision rules, which is an approximation method for solving multistage stochastic linear programming problems. Traditional methods for solving these types of problems suffer from computational efforts that grow exponentially with the number of stages and state variables. By restricting the decision variables to be affine functions of the realisations of the uncertain parameters, the original intractable problem is transformed into a problem with short computational time. The aim is to investigate feasibility of the framework. The approach is demonstrated on four Norwegian hydropower plants using recent inflow and price data over a ten year time horizon. We obtain flexible reservoir management strategies, providing feasible solutions where a deterministic approach fails, and otherwise improving expected profits by up to 4.5% compared to a deterministic approach. Solutions times are in the order of minutes.
Keyword:
Feasibility study
reservoir management
multiple reservoirs
liberalized electricity market
adjustable robust counterpart
stochastic programming
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.2
论文数:
1.1W
被引数:
5.0W
机构
暂无机构信息
引用论文
Tutorial on Stochastic Optimization in Energy-Part II: An Energy Storage Illustration能源随机优化教程-第二部分: 储能插图

