返回
LISA system design highlights
DOI:10.1088/0264-9381/26/9/094015.png)
摘要
En 中文
A contract, started in January 2005, was awarded to a consortium of Astrium GmbH and Astrium Ltd for the LISA Mission Formulation. The scope of the contract was the development of a reference design for the mission architecture and for the mission elements (with particular focus on the payload) and a successive phase of derivation of requirements, to be concluded with a mission design review. The technical starting point was the output of the previous LISA study formalized in the Final Technical Report, issued in the year 2000. During the design phase, different architecture concepts were identified and traded off, including the LISA orbits, the measurement scheme and the opto-mechanical architecture. During the Mission Design Review (July 2008) the consolidated mission baseline design, and the specifications of the flight elements and of the payload subsystem and major components were presented. This paper gives a brief overview of the major design points of the latest design of the LISA system.
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

