1
Return

Logic-based Benders method for multi-skill resource-constrained project scheduling with allocation and skill flexibility

delete2026-05-08
delete0
delete
OA
AI
C
Carla Juvin *
C
Christian Artigues
P
Pierre Lòpez
R
Rémi Brux
DOI:10.1016/j.ejor.2026.05.005delete
deleteOriginal
deleteShare
deleteSave
View PDF
Abstract

Abstract

En 中文
• A multi-skill scheduling problem with allocation and skill flexibility is studied. • A new exact logic-based Benders decomposition approach is developed. • The master problem solves scheduling using constraint programming. • Subproblems verify allocation feasibility via integer programming. • This approach outperforms a monolithic constraint programming model.
Keywords:
multi-skill scheduling
logic-based Benders decomposition
constraint programming
integer programming
resource-constrained project scheduling
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

European Journal of Operational Research cover
European Journal of Operational Research
IF:
6
Papers:
2.2W
Citations:
6.4W

Organization

C
CNRS and Université de Toulouse
Scholars:
93
Papers: 37
Citations: 0
T
tbs business school
Scholars:
52
Papers: 48
Citations: 1
Cited Papers

Cited Papers

Citing Papers

Citing Papers