Machine Learning Algorithms for Construction Projects Delay Risk Prediction

delete2020-01-01
delete162
PRE
AI
A
Ahmed Gondia *
A
Ahmad Siam
W
Wael El‐Dakhakhni
A
Ayman H. Nassar
DOI:10.1061/(ASCE)CO.1943-7862.0001736delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Projects delays are among the most pressing challenges faced by the construction sector attributed to the sector's complexity and its inherent delay risk sources' interdependence. Machine learning offers an ideal set of techniques capable of tackling such complex systems; however, adopting such techniques within the construction sector remains at an early stage. The goal of this study was to identify and develop machine learning models in order to facilitate accurate project delay risk analysis and prediction using objective data sources. As such, relevant delay risk sources and factors were first identified, and a multivariate data set of previous projects' time performance and delay-inducing risk sources was then compiled. Subsequently, the complexity and interdependence of the system was uncovered through an exploratory data analysis. Accordingly, two suitable machine learning models, utilizing decision tree and naive Bayesian classification algorithms, were identified and trained using the data set for predicting project delay extents. Finally, the predictive performances of both models were evaluated through cross validation tests, and the models were further compared using machine-learning-relevant performance indices. The evaluation results indicated that the naive Bayesian model provides a better predictive performance for the data set examined. Ultimately, the work presented herein harnesses the power of machine learning to facilitate evidence-based decision making, while inherent risk factors are active, interdependent, and dynamic, thus empowering proactive project risk management strategies.
Keyword:
Classification
Complex systems
Confusion matrices
Construction projects
Cross validation
Delay risk analysis
Machine learning
Predictive data analytics
Risk identification
Time delay
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.4W

机构

E
egyptian knowledge bank (ekb)
学者数:
11.6W
论文数: 9.3W
被引数: 84
M
McMaster University
学者数:
3.6W
论文数: 3.3W
被引数: 4.4W
引用论文

引用论文

err分享
err收藏
Big Data in the construction industry: A review of present status, opportunities, and future trends建筑行业的大数据: 现状,机遇和未来趋势的回顾
err2016-08-01
err453
PREAI
errBilal, Muhammad; Oyedele, Lukumon O.; Qadir, Junaid; Munir, Kamran; Ajayi, Saheed O.; Akinade, Olugbenga O.; Owolabi, Hakeem A.; Alaka, Hafiz A.; Pasha, Maruf
err分享
err收藏
Cortical Thickness of Functionally Defined Visual Areas in Schizophrenia and Bipolar Disorder
err2016-05-25
err0
errOAAI
errEric A. Reavis; Junghee Lee; Jonathan K. Wynn; Stephen A. Engel; Amy M. Jimenez; Michael F. Green
err分享
err收藏
学者 查看更多内容