MANAGING DATA FLOWS IN INFRASTRUCTURE PROJECTS - THE LIFECYCLE PROCESS MODEL

delete2020-03-03
delete10
delete
OA
AI
H
Heikki Halttula *
H
Harri Haapasalo
R
Risto Silvola
DOI:10.36680/j.itcon.2020.012delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Productivity in the construction industry (both houses and infrastructure) has not been improving as expected, while other industries have been able to improve their productivity significantly. The appropriate use of building information modelling (BIM) technologies brings several benefits and advantages to construction projects. The main challenges of project efficiency emerge in the form of numerous requests for information during the construction project, which are considered to be waste in the processes. This highlights the need for a practical process model to plan the information flow for BIM-based projects. The main aim of this study is to propose a model to plan the flow of project information among primary stakeholders especially in infrastructure projects. Our main findings are firstly, the foundation for data management starts from defining unified one data for the product and the for the process. Unified data means one single repository of data - all stakeholders use the same unified data. It is also essential that data responsibilities and ownership are defined. Secondly, we found that the biggest challenges are that the data needs are not planned beforehand, resistance to change, difficulty receiving existing data and data must be modified before use. As a whole, it seems sometimes that the technology on data transfer is more important that what has been transferred and why. Finally our construction, the life cycle model for data flow originates from one data to all stakeholders, single data repository must be updated along the lifecycle of the object covering also the operations and maintenance, where the data has to be updated through the whole life-cycle. This new approach is intended to enable the early involvement of maintenance stakeholders in designing product data for a project lifecycle perspective. The model helps to change the current information flow and gain the benefits that a BIM-based process can offer. This study is based on case studies and is qualitative in nature and naturally needs more validation.
Keyword:
BIM
life cycle
data flow
infrastructure project
data model
master data
PDM/PLM

期刊

J
Journal of Information Technology in Construction
IF:
3.8
论文数:
285
被引数:
1.6K

机构

U
University of Oulu
学者数:
1.5W
论文数: 1.3W
被引数: 1.6W
引用论文

引用论文

err分享
err收藏
err分享
err收藏
Triplet State Resonance Raman and Absorption Spectroscopy of a Configurationally Locked (Z)-Hexatriene: 1,2-Divinylcyclopentene
err2002-05-01
err0
PREAI
errAnnemarie ten Wolde; Harry J. C. Jacobs; Frans W. Langkilde; Krzysztof Bajdor; Robert Wilbrandt; Fabrizia Negri; Francesco Zerbetto; Giorgio Orlandi
err分享
err收藏
Designing Data Governance
err2010-01-01
err347
PREAI
errKhatri, Vijay; Brown, Carol V.
err分享
err收藏
Product data management practices in high-tech companies
err2009-06-26
err33
errOAAI
errKropsu-Vehkapera, Hanna; Haapasalo, Harri; Harkonen, Janne; Silvola, Risto
err分享
err收藏
学者 查看更多内容