Managing tipping point dynamics in complex construction projects
DOI:10.1061/(ASCE)0733-9364(2008)134:6(421).png)
摘要
En 中文
Complex construction projects are vulnerable to tipping points. Tipping points are conditions that, when crossed, cause system behaviors to radically change performance. Previous research identified tipping point dynamics as capable of explaining the failure of some nuclear power plant construction projects. These dynamics can also threaten the success of other large, complex construction projects. The current work uses a dynamic project model to test policies for managing tipping point dynamics. The Limerick Unit 2 nuclear power plant project is used to test model usefulness. Sensitivity analysis reveals the rework fraction, strength of subsystem interdependence, and sensitivity of the project to schedule pressure as potential high-leverage points for policy design. The model is used to test policies for managing tipping points that were used to complete the Limerick Unit 2 nuclear power plant after a tipping point threatened project completion. Implications for construction project design and management and research opportunities are discussed.
Keyword:
RESOURCE-ALLOCATION
CHANGE MANAGEMENT
THRESHOLD MODELS
COST OVERRUNS
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
J
IF:
5.1
论文数:
5.1K
被引数:
1.4W
机构
引用论文
Comparison of Leaf Disk, Greenhouse, and Field Screening Procedures for Evaluation of Grape Seedlings for Downy Mildew Resistance
HortScience
IF0