返回
Maximum probabilistic all-or-nothing paths
DOI:10.1016/j.ejor.2019.11.011.png)
摘要
En 中文
We consider the problem of a maximum probabilistic all-or-nothing network path. Each arc is associated with a profit and a probability and the objective is to select a path with maximum value for the product of probabilities multiplied by the sum of arc profits. The problem can be motivated by applications including serial-system design or subcontracting of key project activities that may fail. When subcontracting such critical success activities, each must be completed on time, according to the specs, and in a satisfactory manner in order for the entire project to be deemed successful. We develop a dynamic programming (DP) method for this problem in the acyclic graph setting, under an independence assumption. Two different fully-polynomial approximation schemes are developed based on the DP formulations, one of which applies repeated rounding and scaling to the input data, while the other uses only rounding. In experiments we compare the DP approach with mixed-integer nonlinear programming (MINLP) using a branch-and-cut method, on synthetic randomly generated instances as well as realistic ones. (C) 2019 Elsevier B.V. All rights reserved.
Keyword:
Networks
Dynamic programming
Integer non-linear programming
FPTAS
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6
论文数:
2.2W
被引数:
6.4W

