返回
Memetic algorithm for solving resource constrained project scheduling problems
DOI:10.1016/j.autcon.2019.103052.png)
摘要
En 中文
The resource constrained project scheduling problem (RCPSP) has a wide variety of practical applications in construction, manufacturing, project planning, and other areas. Since the 1960s many optimization algorithms have been proposed to solve this NP-hard problem, and their performances are evaluated in well-known test problems with different complexities. Although it is desirable to find an algorithm which can provide promising solutions with reasonable computational efforts for any problem under consideration, no single algorithm can meet that condition. To deal with this challenge, we present a genetic algorithm based memetic algorithm (MA) for solving RCPSP. The algorithm is initiated by a critical path-based heuristic and a variant of the Nawaz, Enscore, and Ham (NEH) heuristic. The algorithm involves a similar block order crossover and a variable insertion based local search. An automatic restart scheme is also presented which assists the algorithm to escape from local optima. In addition, a design-of-experiment (DOE) method is used to determine the set of suitable parameters for the proposed MA. Numerical results, statistical analysis and comparisons with state-of-the-art algorithms demonstrate the effectiveness of the proposed approach.
Keyword:
Project scheduling
Resource constrained
Makespan
Genetic algorithm
Memetic algorithm
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
11.5
论文数:
6.4K
被引数:
5.7W
机构
暂无机构信息
引用论文
A genetic algorithm for permutation flow shop scheduling under make to stock production system库存生产系统下置换流水车间调度的遗传算法
A hybrid genetic algorithm for the resource-constrained project scheduling problem一种求解资源受限项目调度问题的混合遗传算法

