摘要

En 中文
The increasing amount of data produced by Internet of Things (IoT) devices imposes significant limitations on the resources available in conventional cloud data centers, undermining their capacity to accommodate time-sensitive IoT applications. Cloud-fog computing has emerged as a promising paradigm that extends cloud services to the network edge. However, the distribution of tasks in a cloud-fog environment presents new challenges. Our research paper introduces a semi-dynamic real-time task scheduling system designed explicitly for the cloud-fog environment. This algorithm effectively assigns jobs while minimizing energy consumption, cost, and makespan. An adapted version of the grey wolf optimizer is introduced to optimize task scheduling by considering various criteria such as task duration, resource requirements, and execution time. Our approach outperforms existing methods, such as genetic algorithm, particle swarm optimization, and artificial bee colony algorithm, in terms of makespan, total execution time, cost, and energy consumption.
Keyword:
Internet of Things (IoT)
Task scheduling
Fog and edge computing
Optimization
Energy consumption

期刊

C
Cluster Computing-The Journal of Networks Software Tools and Applications
IF:
4.1
论文数:
5.0K
被引数:
7.5K

机构

B
Bahcesehir University
学者数:
1.3K
论文数: 1.6K
被引数: 26
U
university of alberta
学者数:
5.1W
论文数: 4.9W
被引数: 65
L
Lebanese American University
学者数:
3.0K
论文数: 3.0K
被引数: 6.9K
I
Istanbul Technical University
学者数:
8.9K
论文数: 7.8K
被引数: 7.9K
T
Tallinn University of Technology
学者数:
4.3K
论文数: 3.1K
被引数: 4.5K
学者 查看更多机构
引用论文

引用论文

Grey Wolf Optimizer灰狼优化器
err2014-03-01
err1.3W
PREAI
errMirjalili, Seyedali; Mirjalili, Seyed Mohammad; Lewis, Andrew
err分享
err收藏
Relationship between Fatigue and Physical Activity in a Polish Cohort of Multiple Sclerosis Patients
err2020-12-21
err0
errOAAI
errMichalina Rzepka; Mateusz Toś; Michał Boroń; Katarzyna Gibas; Ewa Krzystanek
err分享
err收藏
DEBTS: Delay Energy Balanced Task Scheduling in Homogeneous Fog Networks
err2018-06-01
err129
PREAI
errYang, Yang; Zhao, Shuang; Zhang, Wuxiong; Chen, Yu; Luo, Xiliang; Wang, Jun
err分享
err收藏
Task scheduling in the internet of things: challenges, solutions, and future trends
err2023-04-20
err7
PREAI
errBu, Tianqi; Huang, Zanyu; Zhang, Kairui; Wang, Yang; Song, Haobin; Zhou, Jietong; Ren, Zhangjun; Liu, Sen
err分享
err收藏
err分享
err收藏
err分享
err收藏
学者 查看更多内容