arrow
返回

Minimizing makespan in permutation flow shop scheduling problems using a hybrid metaheuristic algorithm

delete2009-04-01
delete125
PRE
AI
G
G. I. Zobolas *
C
Christos D. Tarantilis
G
George Ioannou
DOI:10.1016/j.cor.2008.01.007delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This paper proposes a hybrid metaheuristic for the minimization of makespan in permutation flow shop scheduling problems. The solution approach is robust, fast. and simply structured, and comprises three components: an initial population generation method based on a greedy randomized constructive heuristic, a genetic algorithm (GA) for solution evolution, and a variable neighbourhood search (VNS) to improve the population. The hybridization of a GA with VNS, combining the advantages of these two individual components, is the key innovative aspect of the approach. Computational experiments on benchmark data sets demonstrate that the proposed hybrid metaheuristic reaches high-quality solutions in short computational times. Furthermore, it requires very few user-defined parameters. rendering it applicable to real-life flow shop scheduling problems. (C) 2008 Elsevier Ltd. All rights reserved.
Keyword:
Production scheduling
Permutation flow shop
Variable neighbourhood search
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

C
Computers and Operations Research
IF:
4.3
论文数:
6.5K
被引数:
1.8W

机构

暂无机构信息
引用论文

引用论文

5 a day for better health: A new research initiative
err1994-01-01
err0
PREAI
errStephen Havas; Jerianne Heimendinger; Kim Reynolds; Tom Baranowski; Theresa A Nicklas; Donald Bishop; David Buller; Glorian Sorensen; Shirley A.A Beresford; Arnette Cowan; Dorothy Damron
err分享
err收藏
Genetic algorithms for flowshop scheduling problems
err1996-09-01
err312
PREAI
errMurata, T; Ishibuchi, H; Tanaka, H
err分享
err收藏
学者 查看更多内容