arrow
返回

Minimizing setup costs in a transfer line design problem with sequential operation processing

delete2014-05-01
delete14
PRE
AI
A
Alexandre Dolgui
S
Sergey Kovalev
M
Mikhail Y. Kovalyov
J
Jenny Nossack
E
Erwin Pesch *
DOI:10.1016/j.ijpe.2013.10.013delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Design problems constitute the first stage in developing a machining transfer line. This paper is concerned with a problem in which a transfer line has to be designed in an optimal way to produce parts of different types. Each part of a specific type requires a unique set of operations to be executed on the stations. Parts move along the stations in the same direction one after another in a given sequence, and a station is set up if at least one operation is executed on this station. Setup costs and times are part-type dependent. Each operation has its size, which is the number of standard tools required to perform this operation, and its processing time. Operations on the same part assigned to the same station are performed sequentially. Re-design, i.e., re-assignment of operations when switching from one type part to another is not allowed. Precedence relations are given on the superset of all operations. There is an upper bound on the total size of operations assigned to the same station, and an upper bound on the time that a part of a given type stays on the same station for all types. The primary objective is to minimize the number of stations. The secondary objective is to minimize the total setup cost. We establish computational complexity of various special cases of this problem, present constructive heuristic algorithms, integer linear programs as well as computational results. These results are applicable in designing transfer lines for mechanical parts manufacturing by multi-spindle turret heads in situations where the station costs are the primary concern and the station setup costs are the secondary concern of the designer. (C) 2013 Elsevier B.V. All rights reserved.
Keyword:
Reconfigurable transfer line
Line design
Line balancing
Setups
Integer linear programming
Complexity
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

International Journal of Production Economics 封面图
International Journal of Production Economics
IF:
10
论文数:
8.0K
被引数:
3.6W

机构

M
mines saint-etienne
学者数:
765
论文数: 612
被引数: 1
N
national academy of sciences of belarus (nasb)
学者数:
2.5K
论文数: 1.8K
被引数: 3
U
universite gustave-eiffel
学者数:
5.6K
论文数: 4.8K
被引数: 5
I
imt - institut mines-telecom
学者数:
7.4K
论文数: 6.4K
被引数: 5
学者 查看更多机构
引用论文

引用论文

Data Mining Using Graphics Processing Units
err2009-01-01
err0
PREAI
errChristian Böhm; Robert Noll; Claudia Plant; Bianca Wackersreuther; Andrew Zherdin
err分享
err收藏
Combinatorial design of a minimum cost transfer line
err2012-01-01
err23
PREAI
errDelorme, Xavier; Dolgui, Alexandre; Kovalyov, Mikhail Y.
err分享
err收藏
err分享
err收藏
Firm Defaults and the Correlation Effect
err2003-07-11
err0
PREAI
errHans Gersbach; Alexander Lipponer
err分享
err收藏
A REVIEW OF FLOWSHOP SCHEDULING RESEARCH WITH SETUP TIMES
err2000-09-01
err0
PREAI
errT. C. EDWIN CHENG; JATINDER N. D. GUPTA; GUOQING WANG
err分享
err收藏
Rubidium dimer destruction by a diode laser
err2005-02-18
err0
PREAI
errT. Ban; D. Aumiler; G. Pichler
err分享
err收藏
学者 查看更多内容