Minimizing work overload in mixed-model assembly lines

delete2008-03-01
delete42
PRE
AI
J
Joaquín Bautista Valhondo *
J
Jaime Alemañ Cano
DOI:10.1016/j.ijpe.2006.08.019delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
A variant of the mixed-model sequencing problem on assembly lines is the one proposed by Yano and Rachamadugu in 1991. They consider time windows in workstations and the work overload concept-sum of differences between real completion time in the workstation and due dates, which depends on the time window value. This paper proposes some procedures for solving the problem, and compares them with others taken from literature using two computational experiments. (c) 2007 Elsevier B.V. All rights reserved.
Keyword:
scheduling
sequencing
just-in-time
work overload
heuristics
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

International Journal of Production Economics 封面图
International Journal of Production Economics
IF:
10
论文数:
8.0K
被引数:
3.6W

机构

U
universitat politecnica de catalunya
学者数:
1.9W
论文数: 1.6W
被引数: 17
引用论文

引用论文

err分享
err收藏
err分享
err收藏
err分享
err收藏
Detection of Pathological Changes in the Aorta during Thoracic Aortic Aneurysm Progression on Molecular Level
err2017-01-01
err0
errOAAI
errMiroslava Rabajdová; Peter Urban; Ivana Špaková; Artemiou Panagiotis; Michaela Ferenčáková; Dušan Rybár; Nikita Bobrov; František Sabol; Mária Mareková
err分享
err收藏
学者 查看更多内容