A predispatch model that minimizes generation and transmission losses on hydroelectric power systems is presented and applied to the hydroelectric power system of COPEL, a Brazilian utility located in southern Brazil, Power loss in the generation and transmission systems is minimized on an hourly basis throughout a day, Load demand as well as generation, transmission and interchange operational constraints are satisfied. Hydroelectric generation characteristics are described in detail. Power loss in hydroelectric generation is associated with a reduction in turbine-generator efficiency and effective water head, The latter is due to an increase in tailrace elevation and penstock head loss, Power loss upon transmission is calculated as a quadratic function of active power now, as represented in a DC load flow model, The predispatch model, was evaluated under typical operational conditions, achieving significant savings with respect to actual operation.
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.2
论文数:
1.1W
被引数:
5.0W
机构
暂无机构信息
引用论文
(Re)Conceptualising Unfree Labour: Local Labour Control Regimes and Constraints on Workers' Freedoms