Mixed-integer linear programming for project scheduling under various resource constraints

delete2024-11-01
delete0
delete
OA
AI
N
Nicklas Klein
M
Mario Gnägi
Ν
Ν. Trautmann *
DOI:10.1016/j.ejor.2024.06.036delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
Project scheduling is an important management task in many companies across different industries. Generally, projects require resources, such as personnel or funds, whose availabilities are limited, giving rise to the challenging problem of resource-constrained project scheduling. In this paper, we consider the scheduling of a project consisting of precedence-related activities that require time and two types of resources for execution: storage resources representing, e.g., the project budget; and renewable resources representing, e.g., personnel or equipment. Storage resources are consumed by activities at their start or produced upon their completion, while renewable resources are allocated to activities at their start and released upon their completion. The resource-constrained project scheduling problem with consumption and production of resources (RCPSP-CPR) consists of determining a minimum-makespan schedule such that all precedence relations are respected, the demand for each renewable resource never exceeds its capacity, and the stock level of each storage resource never falls below a prescribed minimum. Due to the consideration of storage resources, the feasibility variant of this problem is NP-complete. We propose a novel compact mixed-integer linear programming (MILP) model based on a novel type of sequencing variables. These variables enable us to identify which activities are processed in parallel and whether a sequencing of activities is necessary to respect the resource capacities. Our computational results indicate that our novel model significantly outperforms state-of-the-art MILP models for all considered scarcity settings of the storage resources. Additionally, our results indicate a superior performance for instances of the well-known resource-constrained project scheduling problem (RCPSP).
Keyword:
Project scheduling
Mixed-integer linear programming
Resource-constrained project scheduling
Consumption and production of resources
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

European Journal of Operational Research 封面图
European Journal of Operational Research
IF:
6
论文数:
2.2W
被引数:
6.4W

机构

U
University of Bern
学者数:
4.0W
论文数: 3.1W
被引数: 4.8W
引用论文

引用论文

CD4+ regulatory T cells in autoimmunity and allergy
err2002-12-01
err0
PREAI
errMaria A Curotto de Lafaille; Juan J Lafaille
err分享
err收藏
err分享
err收藏
Integrated production and utility system approach for optimizing industrial unit operations
errENERGY
IF9.4
err2010-02-01
err70
errOAAI
errAgha, Mujtaba H.; Thery, Raphaele; Hetreux, Gilles; Hait, Alain; Le Lann, Jean Marc
err分享
err收藏
Murine CD8+ T cells that specifically delete autologous CD4+ T cells expressing Vβ8 TCR: a role of the Qa-1 molecule
err1995-02-01
err0
errOAAI
errHong Jiang; Randle Ware; Alan Stall; Lorraine Flaherty; Leonard Chess; Benvenuto Pernis
err分享
err收藏
err分享
err收藏
学者 查看更多内容