Mixed-integer linear programming for resource leveling problems
DOI:10.1016/j.ejor.2012.03.003.png)
摘要
En 中文
We consider project scheduling problems subject to general temporal constraints, where the utilization of a set of renewable resources has to be smoothed over a prescribed planning horizon. In particular, we consider the classical resource leveling problem, where the variation in resource utilization during project execution is to be minimized, and the so-called overload problem, where costs are incurred if a given resource-utilization threshold is exceeded. For both problems, we present new mixed-integer linear model formulations and domain-reducing preprocessing techniques. In order to strengthen the models, lower and upper bounds for resource requirements at particular points in time, as well as effective cutting planes, are outlined. We use CPLEX 12.1 to solve medium-scale instances, as well as instances of the well-known test set devised by Kolisch et al. (1999). Instances with up to 50 activities and tight project deadlines are solved to optimality for the first time. (C) 2012 Elsevier B.V. All rights reserved.
Keyword:
Project scheduling
Resource leveling
Minimum and maximum time lags
Lower and upper bounds
Cutting planes
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6
论文数:
2.2W
被引数:
8.1W
机构
引用论文
Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints具有一般时间和资源限制的项目计划中的资源均衡和净现值问题的程序
Insertion techniques for static and dynamic resource-constrained project scheduling静态和动态资源受限项目调度的插入技术