Modeling and solving real-time scheduling problems by stochastic integer programming

delete2004-06-01
delete84
PRE
AI
G
Guido Sand
S
Sebastian Engell
DOI:10.1016/j.compchemeng.2003.09.009delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This contribution deals with scheduling problems of flexible chemical batch processes with a special emphasis on their real-time character. This implies not only the need for sufficiently short response times, but in particular the burden of in-complete knowledge about the future. To solve such problems, the application of two-stage stochastic integer programming techniques on moving horizons is proposed. They reflect the need for immediately applicable decisions and the potential of later recourse actions to cope with realized uncertainties. In addition to the classical expected value objective, simple measures of risk can be included. Motivated by an example process, some essential modeling prerequisites are discussed. As an important first step, the master scheduling problem is studied and a number of master scheduling models are presented. Large mixed-integer linear problems arise, which are well-suited for a dual decomposition approach. Numerical experiments with a problem-specific solution algorithm demonstrate the applicability of the method to real-world problems. (C) 2003 Elsevier Ltd. All rights reserved.
Keyword:
batch scheduling
uncertainty
stochastic integer programming
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

C
Computers and Chemical Engineering
IF:
3.9
论文数:
8.1K
被引数:
1.7W

机构

暂无机构信息
引用论文

引用论文

err
IF0
err
err0
PREAI
err
err分享
err收藏
Appendicitis During Pregnancy with a Normal MRI
err2014-09-01
err0
errOAAI
errMatthew Thompson; Alexei Kudla; Chris Chisholm
err分享
err收藏
err分享
err收藏
Issues in the use, design and evolution of process scheduling and planning systems
err1997-01-01
err56
PREAI
errApplequist, G; Samikoglu, O; Pekny, J; Reklaitis, G
err分享
err收藏
err分享
err收藏
学者 查看更多内容