arrow
返回

Modelling and optimizing sequential imperfect preventive maintenance

delete2009-01-01
delete74
delete
OA
AI
M
M. C. Bartholomew‐Biggs *
左明健 封面图
左明健 (Ming J. Zuo)
X
Xiaohu Li
DOI:10.1016/j.ress.2008.03.002delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
This paper deals with the problem of scheduling imperfect preventive maintenance (PM) of some equipment. It uses a model due to Kijima in which each application of PM reduces the equipment's effective age (but without making it as good as new). The approach presented here involves minimizing a performance function which allows for the costs of minimal repair and eventual system replacement as well as for the costs of PM during the equipment's operating lifetime. The paper describes a numerical investigation into the sensitivity of optimum schedules to different aspects of an age-reduction model (including the situation when parts of a system are non-maintainable-i.e., unaffected by PM). (C) 2008 Elsevier Ltd. All rights reserved.
Keyword:
Cost rate
Effective age
Failure mode
Failure rate
Imperfect preventive maintenance
Optimization
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

R
Reliability Engineering and System Safety
IF:
11
论文数:
9.0K
被引数:
5.9W

机构

U
university of hertfordshire
学者数:
128
论文数: 96
被引数: 1.8K
U
University of Alberta
学者数:
2.0K
论文数: 864
被引数: 2.5W
兰州大学 封面图
兰州大学
学者数:
3.1K
论文数: 757
被引数: 1.4W
学者 查看更多机构
引用论文

引用论文

err分享
err收藏
学者 查看更多内容