arrow
返回

More mixed-integer linear programming models for solving three-stage remanufacturing system scheduling problem

delete2024-08-01
delete2
PRE
AI
W
Wenjie Wang
G
Guangdong Tian *
M
Mengqi Luo
张洪浩 封面图
张洪浩 (Honghao Zhang)
G
Gang Yuan
K
Kejia Niu
DOI:10.1016/j.cie.2024.110379delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This paper aims to deal with the three-stage remanufacturing system scheduling problem (3T-RSSP) that minimizes the maximum completion time i.e., makespan. To this end, inspired by distinct modeling ideas, four mixedinteger linear programming (MILP) models are formulated. The modeling ideas used in this paper are sequencebased idea, position-based idea, time-based idea, and adjacent sequence-based idea. Numerical experiments are executed on a set of small-scaled, medium-scaled and large-scaled instances to test the performance of these formulated MILP models in terms of size complexity and computation complexity. Experimental results demonstrate that the sequence-based MILP model (Model 1) is the most efficient one while the time-based MILP model (Model 3) is worst one. The Wilcoxon signed-rank test is also conducted to evaluate the four models. Model 1 is further compared with different optimization solvers, heuristic and some state-of-art heuristics. Comparison results verify the effectiveness and good portability of the MILP model. Moreover, some key parameters contained in 3T-RSSP including end-of-life (EOL) products count, reprocessing lines count, disassembly workstations/reassembly workstations count are also evaluated. Notably, it is concluded that the increase of disassembly workstations/reassembly workstations count can improve the three-stage remanufacturing system's flexibility and contribute to the enhancement of production efficiency.
Keyword:
Three-stage remanufacturing system
scheduling
Makespan
Mixed-integer linear programming
Modeling and optimization

期刊

Computers and Industrial Engineering 封面图
Computers and Industrial Engineering
IF:
6.5
论文数:
1.0W
被引数:
3.8W

机构

B
beijing university of civil engineering & architecture
学者数:
3.5K
论文数: 2.7K
被引数: 2
Z
Zhengzhou University
学者数:
6.8W
论文数: 4.4W
被引数: 8.5W
S
southeast university - china
学者数:
5.3W
论文数: 4.9W
被引数: 57
S
shandong university
学者数:
9.5W
论文数: 6.4W
被引数: 94
学者 查看更多机构
引用论文

引用论文

Defect in proline synthesis: pyrroline‐5‐carboxylate reductase 1 deficiency leads to a complex clinical phenotype with collagen and elastin abnormalities
err2011-04-13
err0
errOAAI
errRita Kretz; Bita Bozorgmehr; Mohamad Hasan Kariminejad; Marianne Rohrbach; Ingrid Hausser; Alessandra Baumer; Matthias Baumgartner; Cecilia Giunta; Ariana Kariminejad; Johannes Häberle
err分享
err收藏
Metaheuristic algorithms for the hybrid flowshop scheduling problem
err2019-11-01
err69
PREAI
errOztop, Hande; Tasgetiren, M. Fatih; Eliiyi, Deniz Tursel; Pan, Quan-Ke
err分享
err收藏
Bi-criteria group scheduling in hybrid flowshops
err2013-10-01
err32
PREAI
errBozorgirad, Mir Abbas; Logendran, Rasaratnam
err分享
err收藏
Mathematical modeling and evolutionary generation of rule sets for energy-efficient flexible job shops
errENERGY
IF9.4
err2017-11-01
err78
PREAI
errZhang, Liping; Tang, Qiuhua; Wu, Zhengjia; Wang, Fang
err分享
err收藏
A Three-Stage Multiobjective Approach Based on Decomposition for an Energy-Efficient Hybrid Flow Shop Scheduling Problem
err2020-12-01
err110
PREAI
errZhang, Biao; Pan, Quan-Ke; Gao, Liang; Meng, Lei-Lei; Li, Xin-Yu; Peng, Kun-Kun
err分享
err收藏
学者 查看更多内容