Multi-equipment collaborative optimization scheduling for intelligent construction scene
DOI:10.1016/j.autcon.2024.105780.png)
摘要
En 中文
How to realize the efficient scheduling of construction equipment and ensure the construction quality is the key problem that restricts the development of intelligent construction technology. This paper proposes a multi- equipment collaborative optimization scheduling method for intelligent construction scene. Firstly, a logical model of intelligent construction scene is proposed, and the characteristics and requirements of construction in intelligent construction scene are clarified. Considering the relationship between construction processes and the control requirements of construction quality, an intelligent planning model of multi-equipment collaborative scheduling scheme is established. Aiming at the problem of equipment scheduling analysis, an improved non- dominant classification genetic algorithm (NSGA-II) is proposed. According to the solution results of the improved NSGA-II, the data mapping relationship between the scheduling scheme and the construction completion time and construction energy consumption is established. The verification and application of the proposed method are carried out by a cable truss structure experimental model.
Keyword:
Intelligent construction scene
Multi-equipment collaboration
Optimized scheduling
Deep learning
Experimental verification
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
11.5
论文数:
6.3K
被引数:
4.2W
机构
引用论文
Investigation of mechanical behaviors of spoke-wheel cable structures through experimental and numerical analysis driven by digital-twin
STRUCTURES
IF4.3
Structural performance of buried reinforced concrete pipelines under deep embankment soil深路堤土体下埋地钢筋混凝土管道的结构性能
Multi-objective time-cost trade-off optimization for the construction scheduling with Rao algorithms
STRUCTURES
IF4.3