Multi-objective complex product assembly scheduling problem considering parallel team and worker skills
DOI:10.1016/j.jmsy.2022.05.003.png)
摘要
En 中文
The flow shop scheduling problem (FSP) is a classic shop scheduling problem with a strong engineering background. As an extension of FSP, the hybrid flow shop scheduling problem (HFSP) involves parallel machine scheduling, and the worker assignment problem on assembly lines (WAPAL) involves worker allocation. Parallel machine scheduling and multi-skilled and multilevel worker allocation are both involved in the actual assembly lines of complex products, but few studies have investigated them simultaneously. This work studies a complex product assembly line scheduling problem considering multi-skilled worker assignment and parallel team scheduling and takes the maximum completion time and the imbalance degree of team workload as the optimization objective. An integer programming model is proposed, and a hybrid coding method considers the worker assignment and task order. Three improved strategies based on a multiple objective evolutionary algorithm (MOEA) are proposed in the local search. Finally, 20 test instances are generated based on actual enterprise labor data, and the results based on the three strategies are compared with six MOEAs. The results show that the three strategies are superior in terms of the quality and distribution of solutions. The inverted generational distance (IGD) index value is increased by 49.97%, 47.89%, 47.08% respectively and the hypervolume (HV) index value is increased by 39.76%, 38.19%, 38.15% respectively.
Keyword:
Flow shop scheduling problem
Assembly line of complex products
Multiple objective evolutionary algorithm
Multi-skilled and multilevel worker
期刊
IF:
14.2
论文数:
2.7K
被引数:
1.6W
机构
引用论文
Factors associated with peritraumatic stress symptoms among the frontline healthcare workers during the outbreak of COVID-19 in China
BMJ Open
IF0
An effective integer program for a general assembly line balancing problem with parallel workers and additional assignment restrictions具有并行工人和附加分配限制的一般装配线平衡问题的有效整数程序