arrow
返回

Multi-objective no-wait flowshop scheduling problems: models and algorithms

delete2012-05-15
delete20
PRE
AI
B
Bahman Naderi *
M
Majid Aminnayeri
M
Morteza Piri
M
Mahdi Hoseinzade Yazdi
DOI:10.1080/00207543.2010.543937delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This article studies multi-objective no-wait flowshop scheduling problems to minimise both makespan and total tardiness. This problem is commonly denoted by F/nwt/TT, C-max. This article mathematically formulates the problem using two effective multi-objective mixed integer linear programming models. The multi-objective mathematical models are then solved by a multiple criteria decision making approach, called Fuzzy programming method. Moreover, the article proposes a novel multi-objective iterated local search algorithm incorporating three types of local search engine: greedy, moderate and curtailed fashions. The algorithm is carefully evaluated for its performance against two available algorithms by means of multi-objective performance measures and statistical tools. The results show that the proposed solution method outperforms the others.
Keyword:
no-wait flowshop scheduling
multi-objective iterated local search algorithm
mixed integer linear programming model
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

International Journal of Production Research 封面图
International Journal of Production Research
IF:
7.3
论文数:
1.1W
被引数:
3.7W

机构

U
University of Tehran
学者数:
2.4W
论文数: 2.3W
被引数: 2.7W
A
Amirkabir University of Technology
学者数:
1.1W
论文数: 1.1W
被引数: 1.0W
引用论文

引用论文

err分享
err收藏
err分享
err收藏
Particle shape as revealed by spectral depolarization
err2007-08-16
err0
errOAAI
errDonald D. Duncan; Michael E. Thomas
err分享
err收藏
err分享
err收藏
err分享
err收藏
Security analysis for a mutually partially unbiased bases–based protocol
err2022-09-28
err0
PREAI
errZehong Chang; Fumin Wang; Junliang Jia; Xiaoli Wang; Yi Lv; Pei Zhang
err分享
err收藏
学者 查看更多内容