返回
Multi-Operator Production Cost Modeling
DOI:10.1109/TPWRS.2019.2918849.png)
摘要
En 中文
While contiguous power systems are often operated by several regional system operators, optimization models have traditionally been designed to generate optimal system-wide scheduling decisions. This paper presents an approach to reflect the existence of multiple system operators making scheduling decisions within an interconnected power system. This approach is explicitly designed to reflect each operator's limited knowledge about other regions when making scheduling decisions. Detailed analysis using a modified IEEE Reliability Test System reveals that the approach mimics real system operations by providing imperfect information to each operator about external operations and external constraints. This approach scales to a 78 000-bus model of the Eastern Interconnection, where a regression analysis provides quantitative insight into which constraints cause inefficiencies when improperly managed in a multi-operator simulation. Because the approach generates distinct regional scheduling problems, unit commitment, and economic dispatch simulations can be applied to individual regions and solved in parallel, enabling production cost simulations at a previously intractable scale.
Keyword:
Power system planning
power system modeling
power system economics
optimization methods
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.2
论文数:
1.1W
被引数:
6.3W
机构
暂无机构信息
引用论文
Recent approaches of unit commitment in the presence of intermittent renewable energy resources: A review在存在间歇性可再生能源的情况下单位承诺的最新方法: 综述

