Multi-project scheduling with two-stage decomposition
DOI:10.1007/s10479-014-1555-0.png)
摘要
En 中文
We consider a non-preemptive, zero time lag multi-project scheduling problem with multiple modes and limited renewable and nonrenewable resources. A two-stage decomposition approach is adopted to formulate the problem as a hierarchy of 0-1 mathematical programming models. In stage one; each project is reduced to a macroactivity with macro-modes. The macro-activities are combined into a single macro-activity network over which the macro-activity scheduling problem (MP) is defined, where the objective is the maximization of the net present value with positive cash flows and the renewable resource requirements are time-dependent. An exact solution procedure and a genetic algorithm (GA) approach are proposed for solving the MP. A GA is also employed to generate an initial solution for the exact solution procedure. The first stage terminates with a post-processing procedure to distribute the remaining resource capacities. Using the start times and the resource profiles obtained in stage one, each project is scheduled in stage two for minimum makespan. Three new test problem sets are generated with 81, 84 and 27 problems each, and three different configurations of solution procedures are tested.
Keyword:
Multiple projects
Multiple modes
Scheduling
Decomposition
Genetic algorithm
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
4.5
论文数:
8.1K
被引数:
2.1W
机构
引用论文
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation重新审视串行和并行资源受限的项目调度方法: 理论和计算
A market-based multi-agent system model for decentralized multi-project scheduling基于市场的分散式多项目调度多agent系统模型