Multi-resource allocation in stochastic project scheduling
DOI:10.1007/s10479-008-0486-z.png)
摘要
En 中文
We propose a resource allocation model for project scheduling. Our model accommodates multiple resources and decision-dependent activity durations inspired by microeconomic theory. First, we elaborate a deterministic problem formulation. In a second stage, we enhance this model to account for uncertain problem parameters. Assuming that the first and second moments of these parameters are known, the stochastic model minimises an approximation of the value-at-risk of the project makespan. As a salient feature, our approach employs a scenario-free formulation which is based on normal approximations of the activity path durations. We extend our model to situations in which the moments of the random parameters are ambiguous and describe an iterative solution procedure. Extensive numerical results are provided.
Keyword:
Resource allocation problem
Project scheduling
Value-at-risk
期刊
IF:
4.5
论文数:
8.0K
被引数:
2.1W
机构
引用论文
Incidence of Hepatitis C Infection among Prisoners by Routine Laboratory Values during a 20-Year Period
PLoS ONE
IF0
Analysis of prognostic factors in male breast cancer: a report of 72 cases from a single institution