arrow
返回

Multi-resource constrained dynamic workshop scheduling based on proximal policy optimisation

delete2021-09-09
delete18
PRE
AI
P
Peng Luo
H
Huan Xiong *
B
Bo Wen Zhang
J
Jie Peng
Z
Zhao Feng Xiong
DOI:10.1080/00207543.2021.1975057delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Multi-resource constrained dynamic workshop scheduling is a complex and challenging task in discrete manufacturing. In this paper, to obtain a high-performance scheduling in limited time, this problem is modelled into a Markov decision process, and solved by proximal policy optimisation algorithm, which can learn from the simulated workshop environment directly. A multi-modal hybrid neural network is used in the model to make good use of numerical state features representing workshop environment information and graphical state features representing constraint information during the learning process. Multi-label technique is used in this paper to decouple the output acts of jobs, machines, tools, and workers. Action mask technique coding the constraints is also used to prune invalid exploration. The experimental results show that compared with heuristic rules such as weighted shortest processing time, weighted modified due date, weighted cost over time, apparent tardiness cost and other reinforcement learning methods such as DeepRM and DeepRM2, the performance of the proposed method is at least $ 1.138\% $ 1.138% better in scheduling penalty.
Keyword:
Dynamic workshop scheduling
Markov decision process
multi-resource constrained scheduling
reinforcement learning
proximal policy optimisation

期刊

International Journal of Production Research 封面图
International Journal of Production Research
IF:
7.3
论文数:
1.1W
被引数:
3.7W

机构

T
tongji university
学者数:
7.9W
论文数: 6.0W
被引数: 98
引用论文

引用论文

err分享
err收藏
学者 查看更多内容