arrow
返回

Multi-Stage Robust Dynamic Unit Commitment Based on Pre-Extended -Fast Robust Dual Dynamic Programming

delete2023-05-01
delete29
PRE
AI
H
Houbo Xiong
Y
Yunhui Shi
Z
Zhe Chen
C
Chuangxin Guo *
丁
丁一 (Yi Ding)
DOI:10.1109/TPWRS.2022.3179817delete
delete原文链接
delete分享
delete收藏
摘要

摘要

En 中文
To naturally characterize the long-time sequence coupled equipment such as energy storage systems (ESS) and to enforce the non-anticipativity of dispatch decisions under uncertain renewable energy, a multi-stage robust dynamic unit commitment (MRDUC) model is proposed in this paper. MRDUC transforms the multi-stage robust unit commitment into a dynamic programming form, which is the first attempt to combine day-ahead optimization with intra-day multi-stage robust dynamic dispatch. The unit commitment problem is solved in the pre-stage, and a simulation of intra-day multi-stage economic dispatch is done thereafter, which further refines the UC decision in an iterative way. A pre-extended -fast robust dual dynamic programming (PE-FRDDP) method is proposed to efficiently solve the MRDUC problem, which simultaneously optimizes the day-ahead UC and the intra-day decision policies. Case studies on the modified IEEE 6-Bus and 4 large-scale systems from 300 to 1888 buses demonstrate the effectiveness of the proposed model and the solution methodology.
Keyword:
Optimization
Dynamic programming
Power system dynamics
Generators
Costs
Power systems
Stochastic processes
energy storage systems
multi-stage robust optimization
pre-extended -fast robust dual dynamic programming
unit commitment

期刊

IEEE Transactions on Power Systems 封面图
IEEE Transactions on Power Systems
IF:
7.2
论文数:
1.1W
被引数:
5.0W

机构

S
State Grid Corporation of China
学者数:
6.5K
论文数: 5.2K
被引数: 1.7K
Z
zhejiang university
学者数:
17.7W
论文数: 12.1W
被引数: 152
引用论文

引用论文

Robust Risk-Constrained Unit Commitment With Large-Scale Wind Generation: An Adjustable Uncertainty Set Approach
err2017-01-01
err125
errOAAI
errWang, Cheng; Liu, Feng; Wang, Jianhui; Qiu, Feng; Wei, Wei; Mei, Shengwei; Lei, Shunbo
err分享
err收藏
err分享
err收藏
err分享
err收藏
err分享
err收藏
err分享
err收藏
CEMETERIES AND URBAN LAND VALUE
err1971-01-01
err0
PREAI
errW. G. Hardwick; R. J. Claus; D. C. Rothwell
err分享
err收藏
Look-ahead risk-constrained scheduling of wind power integrated system with compressed air energy storage (CAES) plant
errENERGY
IF9.4
err2018-10-01
err43
PREAI
errAliasghari, Parinaz; Zamani-Gargari, Milad; Mohammadi-Ivatloo, Behnam
err分享
err收藏
Security-Constrained Unit Commitment With Flexible Uncertainty Set for Variable Wind Power
err2017-07-01
err125
PREAI
errShao, Chengcheng; Wang, Xifan; Shahidehpour, Mohammad; Wang, Xiuli; Wang, Biyang
err分享
err收藏
学者 查看更多内容