arrow
返回

Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism

delete2003-01-01
delete91
PRE
AI
Y
Yong‐Han Lee *
K
Kumara, SRT
K
Kalyan Chatterjee
DOI:10.1023/A:1025753309346delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
The resource scheduling problem in a multi-project environment extends job-shop scheduling problems by allowing for task dependency and multiple self-interested entities. In this paper we deal with short-term scheduling of resources, which are shared by multiple projects. In specific, we address the dynamic nature of the situation. We model this as a dynamic economy, where the multiple local markets are established and cleared over time, trading resource time slots (goods). Due to the dynamic and distributed nature of the economy, through our approach we can achieve higher levels of flexibility, scalability and adaptability. Unlike most market-based mechanisms, which are based on equilibrium concepts and iterative adjustment of resources prices, we propose a novel market mechanism called precedence cost tatonnement (P-TATO), which solves individual resource-constrained local resource scheduling in an optimal way, and searches for a precedence conflict-free schedule through a tatonnement type procedure. In this paper, we discuss our dynamic economy model and some details of the market mechanism along with empirical analysis results.
Keyword:
multi-agent system
market-based control
distributed multiple projects
scheduling
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Journal of Intelligent Manufacturing 封面图
Journal of Intelligent Manufacturing
IF:
7.4
论文数:
3.5K
被引数:
1.1W

机构

暂无机构信息
引用论文

引用论文

暂无论文信息