arrow
返回

Multiobjective dynamic scheduling using discrete event simulation

delete2001-01-01
delete33
PRE
AI
S
Sivakumar, AI
DOI:10.1080/09511920150216279delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
A discrete event simulation-based `on-line near-real-time' dynamic multiobjective scheduling system has been conceptualized, designed, and developed to achieve Pareto optimal solutions in a complex manufacturing environment. Our approach includes the use of a linear optimization algorithm with multiple objectives and auto simulation model generation. Manufacturing is one of the most complex elements of the supply chain and we focus on manufacturing to demonstrate the capability that may be extended in future to the entire supply chain. We have implemented the system at a semiconductor back-end site to test our solutions. The impact of the system includes the achievement of world class cycle time, improved machine utilization, reduction in the time that planners and manufacturing personnel spend on scheduling, and more predictable and highly repeatable manufacturing performance. In addition, it enables managers and senior planners to carry out `what if' analysis to plan for the future.
Keyword:
TIME
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

I
International Journal of Computer Integrated Manufacturing
IF:
4
论文数:
2.3K
被引数:
3.4K

机构

暂无机构信息
引用论文

引用论文

暂无论文信息