On path correlation and PERT bias
DOI:10.1016/j.ejor.2007.01.061.png)
摘要
En 中文
Most studies of project time estimation assume that (a) activity times are mutually independent random variables; many also assume that (b) path completion times are mutually independent. In this paper, we subject the impact of both these assumptions to close scrutiny. Using tools from multivariate analysis, we make a theoretical study of the direction of the error in the classical PERT method of estimating mean project completion time when correlation is ignored. We also investigate the effect of activity dependence on the normality of path length via simulation. (C) 2007 Elsevier B.V. All rights reserved.
Keyword:
project management
PERT
correlation
project networks
Slepian's inequality
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6
论文数:
2.2W
被引数:
6.4W
机构
引用论文
Autoxidation of 4-amorphen-11-ol and the biogenesis of nor- and seco-amorphane sesquiterpenes from fabiana imbricata
Tetrahedron
IF0
Tat-Interacting Protein 30 (TIP30) Expression Serves as a New Biomarker for Tumor Prognosis: A Systematic Review and Meta-Analysis
PLOS ONE
IF0
没有更多内容