返回
Onsite 3D marking for construction activity tracking
DOI:10.1016/j.autcon.2012.11.027.png)
摘要
En 中文
This article presents an innovative onsite 3D marking approach for tracking the progress of construction activities using an Ultra Wide Band (UWB) positioning system. The 3D marking approach is used to track activities that could not be tracked previously using object-based tracking models, including welding and inspection activities for pipelines. A field experimentation study on an industrial-type building construction project was conducted to demonstrate the method and evaluate its performance in a construction environment and a software application was developed using MATLAB to automate the data analysis and progress estimation procedure. The results of the field experiments confirmed the feasibility of the developed 3D marking approach for tracking a number of construction activities, such as welding and inspection, which are not associated with the addition or movement of objects on a site and therefore could not be tracked using traditional object-based models. (C) 2012 Elsevier B.V. All rights reserved.
Keyword:
Progress estimation
Activity tracking
Material tracking
Data fusion
UWB
Performance
Indoor construction
Piping
Field implementation
Experimental
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
11.5
论文数:
6.3K
被引数:
4.2W
机构
引用论文
Static and dynamic performance evaluation of a commercially-available ultra wideband tracking system

