Optimal BIM staffing in construction projects using a queueing model

delete2020-05-01
delete17
PRE
AI
N
Namhyuk Ham
S
Sungkon Moon
J
Ju-Hyung Kim *
J
Jae-Jun Kim
DOI:10.1016/j.autcon.2020.103123delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
BIM staff plays the important role of providing required information from digital models to project participants. A dilemma is determining the appropriate capacity of BIM staff without sacrificing efficiency in terms of human resource costs. Despite the importance of BIM staffing, its effects on the productivity and performance of construction projects have rarely been investigated. This study presents a framework for quantifying the impact of BIM staffing. First, this study proposes a method to evaluate the activities of BIM staff by introducing a time-dependent queueing model. Second, the proposed framework is validated with data from three real-world projects in which BIM was applied. The effects of BIM staffing on the waiting time of project participants are quantitatively analyzed using time and cost indicators. The results show that decisions about optimal BIM staffing can be made by considering the waiting costs of project participants.
Keyword:
BIM staffing
Queueing model
BIM RFIs
Waiting time
Waiting cost
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Automation in Construction 封面图
Automation in Construction
IF:
11.5
论文数:
6.3K
被引数:
4.2W

机构

S
Swinburne University of Technology
学者数:
9.3K
论文数: 1.2W
被引数: 2.0W
引用论文

引用论文

Shear Adhesion Strength of Gecko-Inspired Tapes on Surfaces with Variable Roughness
err2013-12-02
err0
PREAI
errIsabel Rodriguez; Chee Tiong Lim; Sriram Natarajan; Audrey Yoke Yee Ho; Emma Luong Van; Noha Elmouelhi; Hong Yee Low; Murty Vyakarnam; Kevin Cooper
err分享
err收藏
A timed workflow process model
err2001-01-01
err100
PREAI
errZhuge, H; Cheung, TY; Pung, HK
err分享
err收藏
err分享
err收藏
err分享
err收藏
学者 查看更多内容