返回
Optimal np control chart with curtailment
DOI:10.1016/j.ejor.2005.03.038.png)
摘要
En 中文
This article presents an algorithm for the optimization design of the np control chart with curtailment. The objective is to maximize the effectiveness of the np chart, while holding the false alarm rate at a specified level and maintaining its simplicity for understanding and operation to a large degree. The optimization algorithm can be applied to a 100% inspection as well as a general random sampling inspection. The effectiveness of the chart is measured by the out-of-control average time to signal (ATS) under the steady-state mode. This mode allows a shift in fraction nonconforming, p, to occur at any time during the inspection of a sample and, therefore, provides more realistic results than the zero-state mode. According to several performance studies and an illustrative example that are conducted in this research, the optimal np chart with curtailment may reduce the out-of-control ATS by nearly half, on average, compared to the conventional np charts. (c) 2005 Elsevier B.V. All rights reserved.
Keyword:
quality control
average time to signal
sample size
curtailment
steady-state mode
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6
论文数:
2.2W
被引数:
6.4W
机构
暂无机构信息
引用论文
The organizational attributes of HIV care delivery models in Canada: A cross-sectional study
PLOS ONE
IF0

