返回
Optimal project adjustment and selection
DOI:10.1016/j.econmod.2013.10.004.png)
摘要
En 中文
These days companies are competing in a fast changing environment. To keep its competitiveness, the company needs not only to seek and select new investment opportunities but also to adjust its existing projects. This paper discusses an optimal project selection and adjusting problem under capital and land resource limitations. Due to the complex and dynamic nature of the economic environment, the project parameters such as initial outlays, upgrade expenditures and net cash flows are treated as random variables. Net present value method is employed to calculate the investment return, and a mean-variance optimal adjustment and selection model is developed. To solve the proposed optimization problem with big number decision variables, a cellular binary particle swarm optimization which hybridizes cellular automation and particle swarm optimization is proposed. As an illustration of the proposed algorithm, a numerical example is also presented. (C) 2013 Elsevier B.V. All rights reserved.
Keyword:
Project selection
Project adjustment
Capital budgeting
Project management
Binary particle swarm optimization
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
4.7
论文数:
6.6K
被引数:
1.6W
机构
引用论文
A packing-multiple-boxes model for R&D project selection and scheduling用于R & D项目选择和计划的包装多箱模型
TECHNOVATION
IF10.9
A discrete version of particle swarm optimization for flowshop scheduling problems用于流水车间调度问题的粒子群优化算法的离散版本
A multiobjective evolutionary approach for linearly constrained project selection under uncertainty不确定条件下线性约束项目选择的多目标进化方法

