摘要

摘要

En 中文
Underground mine production scheduling possesses mathematical structure similar to and yields many of the same challenges as general scheduling problems. That is, binary variables represent the time at which various activities are scheduled. Typical objectives seek to minimize costs or some measure of production time, or to maximize net present value; two principal types of constraints exist: (i) resource constraints and (ii) precedence constraints. In our setting, we maximize discounted metal production for the remaining life of an underground lead and zinc mine that uses three different underground methods to extract the ore. Resource constraints limit the grade, tonnage, and backfill paste (used for structural stability) in each time period, while precedence constraints enforce the sequence in which extraction (and backfill) is performed in accordance with the underground mining methods used. We tailor exact and heuristic approaches to reduce model size, and develop an optimization-based decomposition heuristic; both of these methods transform a computationally intractable problem to one for which we obtain solutions in seconds, or, at most, hours for problem instances based on data sets from the Lisheen mine near Thurles, Ireland. (C) 2014 Elsevier B.V. All rights reserved.
Keyword:
Mining/metals industries: determining optimal operating policies at an underground mine
Production/scheduling applications production scheduling at an underground mine Integer programming applications determining a production schedule
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

European Journal of Operational Research 封面图
European Journal of Operational Research
IF:
6
论文数:
2.2W
被引数:
6.4W

机构

C
Colorado School of Mines
学者数:
5.6K
论文数: 5.5K
被引数: 1.0W
引用论文

引用论文

err分享
err收藏
Underground Planning at Stillwater Mining Company
err2001-08-01
err0
PREAI
errW. Matthew Carlyle; B. Curtis Eaves
err分享
err收藏
Extraction and Backfill Scheduling in a Complex Underground Mine
err2014-04-01
err0
PREAI
errDónal O’Sullivan; Alexandra Newman
err分享
err收藏
Combining Ability and Heterosis for Grain Iron and Zinc Densities in Pearl Millet珍珠粟的铁,锌密度的结合力和杂种优势
err2013-03-01
err0
errOAAI
errM. Govindaraj; K. N. Rai; P. Shanmugasundaram; S. L. Dwivedi; K. L. Sahrawat; A. R. Muthaiah; A. S. Rao
err分享
err收藏
学者 查看更多内容