Optimization models for the tool change scheduling problem

delete2008-10-01
delete32
PRE
AI
C
Chen, Jen-Shiang *
DOI:10.1016/j.omega.2006.04.006delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Traditional machine scheduling literature generally assumes that a machine is available at all times. Yet this assumption may not be accurate in real manufacturing systems. In many cases, a machine's tool must be changed after it has continuously worked for a period of time. This paper deals with a single machine scheduling problem subject to tool wear, given the allowed maximum continuous working time of the machine is T-L (tool life) and the tool change time is T-C. Job processing and tool changes are scheduled simultaneously. In this paper, we examine this problem to minimize the total tardiness of jobs. Two mixed binary integer programming models are developed to optimally solve this problem. Computational experiments are performed to evaluate the models' efficiency. (C) 2006 Elsevier Ltd. All rights reserved.
Keyword:
scheduling
tool change
integer programming
tardiness
availability constraints
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

O
Omega-International Journal of Management Science
IF:
7.2
论文数:
3.7K
被引数:
1.4W

机构

暂无机构信息
引用论文

引用论文

err分享
err收藏