Optimizing construction planning schedules by virtual prototyping enabled resource analysis
DOI:10.1016/j.autcon.2009.04.002.png)
摘要
En 中文
The inherent uncertainty and complexity of construction work make construction planning a particularly difficult task for project managers due to the need to anticipate and visualize likely future events. Conventional computer-assisted technology can help but is often limited to the constructability issues involved. Virtual prototyping, however. offers an improved method through the visualization of construction activities by computer simulation - enabling a range of 'what-if' questions to be asked and their implications on the total project to be investigated. This paper describes the use of virtual prototyping to optimize construction planning schedules by analyzing resource allocation and planning with integrated construction models. resource models, construction planning schedules and site-layout plans. A real-life case study is presented that demonstrates the use of a virtual prototyping enabled resource analysis to reallocate space, logistic on access road and arrange tower cranes to achieve a 6-day floor construction cycle. (C) 2009 Elsevier B.V. All rights reserved.
Keyword:
Construction planning schedule
Virtual prototyping
Space
Resource analysis
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
11.5
论文数:
6.3K
被引数:
4.2W
机构
引用论文
Two Synthetic Antibodies that Recognize and Neutralize Distinct Proteolytic Forms of the Ebola Virus Envelope Glycoprotein
ChemBioChem
IF0