Optimum Finance-Based Scheduling

delete2024-09-01
delete0
PRE
AI
F
Fırat Doğu Akın
A
Atilla Damcı
D
David Arditi *
DOI:10.1061/JCEMD4.COENG-15103delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Even though advanced heuristic and metaheuristic models have been developed for minimizing financing cost by using total float to adjust the start times of activities, these models overlook the fact that the attempt to minimize financing cost may result in more than one work schedule with minimum financing cost. It is therefore not surprising that no research has been conducted to select the best financing schedule out of the multiple optimal work schedules. It is well known that total float must be used sparingly to avoid the creation of too many critical and near-critical activities that may cause delays in the project duration. Indeed, the loss of schedule flexibility caused by the use of total float comes at a cost. It is argued in this paper that the cost of float consumption should be a vital part of models designed to minimize financing cost. The research presented in this paper attempts to fill this gap. A model is proposed in this study that not only minimizes financing cost but also demonstrates the negative impact of not considering the cost of float consumption in reaching the optimal solution, an area of research that is mostly overlooked in the finance-based scheduling literature. This research contributes to the body of knowledge by demonstrating that there may be more than one work schedule with minimum financing cost, and that the cost of float consumption must be considered to find the most optimal solution.
Keyword:
Finance-based scheduling
Financing cost
Total float
Optimal financing models

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.4W

机构

I
Illinois Institute of Technology
学者数:
3.8K
论文数: 3.9K
被引数: 4.2K
I
Istanbul Technical University
学者数:
8.9K
论文数: 7.8K
被引数: 7.9K
引用论文

引用论文

Use of float consumption rate in resource leveling of construction projects
err2020-06-04
err6
PREAI
errDamci, Atilla; Polat, Gul; Akin, Firat Dogu; Turkoglu, Harun
err分享
err收藏
Predictive value of Sox2 expression in transurethral resection specimens in patients with T1 bladder cancer
err2013-01-10
err0
PREAI
errJun Ruan; Bingbing Wei; Zhuoqun Xu; Shudong Yang; You Zhou; Minhong Yu; Jiabei Liang; Ke Jin; Xing Huang; Peng Lu; Huan Cheng
err分享
err收藏
Effects of airborne Aspergillus on serum aflatoxin B1 and liver enzymes in workers handling wheat flour
err2015-02-19
err0
PREAI
errA Saad-Hussein; MM Taha; NN Fadl; A-H Awad; H Mahdy-Abdallah; G Moubarz; H Aziz; KA El-Shamy
err分享
err收藏
USING ACID-WASHED SHREDDED WASTE-TIRE RUBBER IN SOILLESS MEDIA FOR TOMATO PRODUCTION
err2012-06-01
err0
PREAI
errA. H. Khoshgoftarmanesh; H. R. Eshghizadeh; R. L. Chaney
err分享
err收藏
err分享
err收藏
学者 查看更多内容