Planning reliability demonstration tests with limited expected risks

delete2022-03-01
delete8
PRE
AI
A
Arturo J. Fernández *
DOI:10.1016/j.cie.2021.107918delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Optimal reliability demonstration test plans with controlled expected producer and consumer risks are computed. Device failure times follow Weibull distributions, whereas prior information on device reliability is described by limited beta models. Minimum-cost test durations, sample sizes and acceptance numbers are found by solving mixed integer nonlinear programming problems. Lower and upper bounds on the minimal feasible number of failures allowed, as well as a reasonable approximation, are first deduced. An iterative method is then presented for determining the optimal lot inspection plan. Numerical and graphical analyses and several applications in industrial manufacturing are also provided for illustrative and comparative purposes. The inclusion of substantial prior knowledge allows the reliability engineer to reduce test time, sample size and cost, and leads to improved risk assessments for both producers and consumers. The proposed approach also enables the practitioners the flexibility to define precise limits of the device reliability and to combine multiple experts' opinions. In addition, the best plan can continually be updated as more subjective or objective information becomes available.
Keyword:
Reliability testing
Lot sentencing
Limited beta distribution
Mixed integer nonlinear programming
Weibull model

期刊

Computers and Industrial Engineering 封面图
Computers and Industrial Engineering
IF:
6.5
论文数:
1.0W
被引数:
3.8W

机构

U
universidad de la laguna
学者数:
1.1W
论文数: 8.1K
被引数: 38
引用论文

引用论文

err
IF0
err
err0
PREAI
err
err分享
err收藏
Accelerated Life Test Planning for Minimizing Misclassification Risks
err2021-06-01
err3
errOAAI
errGao, Liang; Ye, Zhi-Sheng; Chen, Wenhua; Qian, Ping; Pan, Jun
err分享
err收藏
err分享
err收藏
学者 查看更多内容