Predicting construction cost overruns using text mining, numerical data and ensemble classifiers
DOI:10.1016/j.autcon.2014.02.014.png)
摘要
En 中文
This paper discusses how text describing a construction project can be combined with numerical data to produce a prediction of the level of cost overrun using data mining classification algorithms. Modeling results found that a stacking model that combined the results from several classifiers produced the best results. The stacking ensemble model had an average accuracy of 43.72% for five model runs. The model performed best in predicting projects completed with large cost overruns and projects near the original low bid amount. It was found that a stacking model that used only numerical data produced predictions with lower precision and recall. A potential application of this research is as an aid in budgeting sufficient funds to complete a construction project. Additionally, during the planning stages of a project the research can be used to identify a project that requires increased scrutiny during construction to avoid cost overruns. (C) 2014 Elsevier B.V. All rights reserved.
Keyword:
Construction cost
Data mining
Text mining
Prediction
期刊
IF:
11.5
论文数:
6.3K
被引数:
4.2W
机构
引用论文
Automating hierarchical document classification for construction management information systems自动化施工管理信息系统的层次文档分类
Comparison of Leaf Disk, Greenhouse, and Field Screening Procedures for Evaluation of Grape Seedlings for Downy Mildew Resistance
HortScience
IF0
Physiological and behavioral responses to corticotropin-releasing factor administration: is CRF a mediator of anxiety or stress responses?促肾上腺皮质激素释放因子的生理和行为反应: CRF是焦虑或应激反应的中介物吗?