arrow
返回

Predicting Project Performance in the Construction Industry

delete2020-05-01
delete84
PRE
AI
R
Rayan H. Assaad
I
Islam H. El-adaway *
I
Ibrahim Abotaleb
DOI:10.1061/(ASCE)CO.1943-7862.0001797delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
Regardless of the different project characteristics in the construction industry, cost and schedule overruns are always regarded as being of paramount importance in the project controls area. Numerous research efforts have been directed to forecast the aforementioned two important project variables using different modeling techniques. However, no prior work is believed to have offered an integrated approach to estimating the performance of construction projects. This critical knowledge gap is compounded even more by the evolving complexities and uncertainties in today's construction industry. This paper creates a holistic framework to evaluate project progress and to predict its performance by incorporating a broad spectrum of inputs. The objectives are to (1) quantify the impacts of the risks related to the performance of projects in terms of cost and schedule; (2) formulate a holistic assessment model; and (3) correlate the developed system to predict cost and time at project completion. To this end, a multistep research methodology was utilized. First, for data collection, a survey was distributed and filled by 63 construction experts to study the effects of 25 performance risks that have shown to be the most important based on a meta-analysis of the literature in a previous study. Second, mathematical and statistical analysis techniques were used to develop a model that maps the investigated project risks to both cost and schedule performance. Steps included fitting parametric and nonparametric distributions, calculating cost overruns, verifying the model, and providing guidelines for using the proposed model. Third, for application, a hypothetical dataset was used to demonstrate the use of the model, its ability to deduce real-world behavior patterns, and associated limitations. The developed framework contributes to the body of knowledge by providing a novel model that improves project performance in terms of prediction, control, management, analysis, and decision making based on an individualized assessment of different risk indicators. This study is valuable for the construction industry because it allows all stakeholders to evaluate the performance of construction projects based on a list of variables, ultimately ensuring more effective and efficient delivery and execution of projects. (c) 2020 American Society of Civil Engineers.
Keyword:
EARNED VALUE MANAGEMENT
INHIBITING-FACTORS
IMPACT
TIME
COST
ACCURACY
MODELS
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.4W

机构

University of Missouri System 封面图
University of Missouri System
学者数:
3.0W
论文数: 2.7W
被引数: 75
引用论文

引用论文

Efficacy of prophylactic intravenous granisetron in postoperative emesis in adults
err2004-08-01
err0
PREAI
errKazuo Hanaoka; Hidenori Toyooka; Toyoki Kugimiya; Yasuo Ohashi
err分享
err收藏
Risk-Based Protocol for Inspection of Transportation Construction Projects Undertaken by State Departments of Transportation
err2013-08-01
err28
PREAI
errMostafavi, Ali; Abraham, Dulcy; Noureldin, Samy; Pankow, Greg; Novak, Joseph; Walker, Ronald; Hall, Kevin; George, Bren
err分享
err收藏
A comparison of two prospective risk analysis methods: Traditional FMEA and a modified healthcare FMEA
err2016-11-07
err45
errOAAI
errRah, Jeong-Eun; Manger, Ryan P.; Yock, Adam D.; Kim, Gwe-Ya
err分享
err收藏
Perception of corporate social responsibility: the case of Chinese international contractors
err2015-11-01
err77
PREAI
errWu, Chun-Lin; Fang, Dong-Ping; Liao, Pin-Chao; Xue, Jia-Wei; Li, Yan; Wang, Tao
err分享
err收藏
err
IF0
err
err0
PREAI
err
err分享
err收藏
学者 查看更多内容