arrow
返回

Prefabricated Construction Process Optimization Based on Rework Risk

delete2022-06-01
delete21
PRE
AI
沈楷程 封面图
沈楷程 (Kaicheng Shen)
李小冬 封面图
李小冬 (Xiaodong Li)
曹新颖 封面图
曹新颖 (Xinying Cao) *
Z
Zhihui Zhang
DOI:10.1061/(ASCE)CO.1943-7862.0002277delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
In prefabricated construction (PC) projects, component manufacturing and site construction are implemented concurrently to improve productivity. However, concurrent PC provides feedback information on each task, and iterations and coupling tasks often exist, which causes rework at a certain probability. Therefore, it is necessary to identify and optimize coupling tasks to reduce feedback information and rework costs and time. In this paper, a PC process optimization model that includes two modules is constructed. The first module is a coupling task optimization module and is built using the design structure matrix (DSM) method with graph theory to identify and reduce coupling tasks. Then a rework risk impact optimization module is built with cost and time minimization as objectives based on a genetic algorithm (GA) according to risk communication, rework probability, and core tasks. A case study is used to verify the model and reveals an 82.24% reduction of the impacts of rework risk on costs and time. The coupling tasks that are optimized as task groups require that the corresponding stakeholders be coordinated. Core tasks should be carried out in advance to avoid greater impacts in later periods. The model extends existing process optimization methods and has value for planning and controlling PC management to enhance coordination among all stakeholders. This study provides a reference for future research on rework risk prediction.
Keyword:
Prefabricated construction (PC)
Process optimization
Rework risk
Design structure matrix (DSM)
Genetic algorithm (GA)

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.4W

机构

T
tsinghua university
学者数:
11.9W
论文数: 10.0W
被引数: 137
H
Hainan University
学者数:
2.0W
论文数: 1.2W
被引数: 1.9W
引用论文

引用论文

Acute Psychosocial Stress-Mediated Changes in the Expression and Methylation of Perforin in Chronic Fatigue Syndrome
err2013-01-28
err0
errOAAI
errVirginia R. Falkenberg; Toni Whistler; Janna R. Murray; Elizabeth R. Unger; Mangalathu S. Rajeevan
err分享
err收藏
err分享
err收藏
Structuring Multilevel Discrete-Event Systems With Dependence Structure Matrices
err2020-04-01
err15
errOAAI
errGoorden, Martijn; van de Mortel-Fronczak, Joanna; Reniers, Michel; Fokkink, Wan; Rooda, Jacobus
err分享
err收藏
err分享
err收藏
Exploring the challenges to industrialized residential building in China
err2014-01-01
err164
errOAAI
errZhang, Xiaoling; Skitmore, Martin; Peng, Yi
err分享
err收藏
Carbonation of Sodium Aluminate/Sodium Carbonate Solutions for Precipitation of Alumina Hydrates—Avoiding Dawsonite Formation
err2021-07-20
err0
errOAAI
errDanai Marinos; Dimitrios Kotsanis; Alexandra Alexandri; Efthymios Balomenos; Dimitrios Panias
err分享
err收藏
Predicting Cherax quadricarinatus Habitat Distribution Patterns Through the Usage of GIS and eDNA Analysis in Terengganu, Malaysia
err2023-02-28
err0
errOAAI
errMohamad Zulkarnain Mohd Dali; Muhammad Syafiq Aiman Mohd Nasir; Aliyu Garba Khaleel; Mun Chun Leong; Han Ming Gan; Nik Ahmad Firdaus Nik Wan; Roslan Umar; Ahmad Syazni Kamarudin
err分享
err收藏
Optimal Work Assignment to Multiskilled Resources in Prefabricated Construction
err2019-04-01
err42
PREAI
errNasirian, Araz; Arashpour, Mehrdad; Abbasi, Babak; Akbarnezhad, Ali
err分享
err收藏
err分享
err收藏
Research on the rework risk core tasks in prefabricated construction in China
err2021-01-11
err14
PREAI
errShen, Kaicheng; Li, Xiaodong; Cao, Xinying; Zhihui, Zhang
err分享
err收藏
学者 查看更多内容