返回
Probabilistic access forecasting for improved offshore operations
DOI:10.1016/j.ijforecast.2020.03.007.png)
摘要
En 中文
Improving access is a priority in the offshore wind sector, driven by the opportunity to increase revenues, reduce costs, and improve safety at operational wind farms. This paper describes a novel method for producing probabilistic forecasts of safetycritical access conditions during crew transfers. Methods of generating density forecasts of significant wave height and peak wave period are developed and evaluated. It is found that boosted semi-parametric models outperform those estimated via maximum likelihood, as well as a non-parametric approach. Scenario forecasts of sea-state variables are generated and used as inputs to a data-driven vessel motion model, based on telemetry recorded during 700 crew transfers. This enables the production of probabilistic access forecasts of vessel motion during crew transfer up to 5 days ahead. The above methodology is implemented on a case study at a wind farm off the east coast of the UK. (C) 2020 The Authors. Published by Elsevier B.V. on behalf of International Institute of Forecasters.
Keyword:
Wind energy
Offshore access
Probabilistic forecasting
Multivariate forecasting
Forecast visualisation
Generalised additive models
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.1
论文数:
3.1K
被引数:
9.9K
机构
引用论文
Weather window analysis of Irish west coast wave data with relevance to operations 82 maintenance of marine renewables
RENEWABLE ENERGY
IF9.1
Non-parametric probabilistic forecasts of wind power: Required properties and evaluation风力发电的非参数概率预测: 要求的属性和评估
WIND ENERGY
IF3.3

