This paper presents three mixed-integer linear programming models to assist project managers in making decisions to compress project completion time under realistic activity time-cost relationship assumptions. The models assume nonlinear activity time-cost functions that are rational functions that can be convex or concave. A user of the models needs to estimate an activity time between normal and crash times where the rate of increase in the cost of performing an activity changes significantly. An efficient piecewise linearization method is presented through which nonlinear cost functions can be approximated in a mixed-integer linear programming model. Each of the models focuses on a different objective a project manager may pursue, such as minimizing project completion subject to a crash budget constraint, or minimizing total project cost, or minimizing total cost under late completion penalties or minimizing total cost with early completion bonuses of a project contract. The paper also uses a simple example which has activities that have all the different types of cost functions discussed in the paper to demonstrate how each model can be used for a project manager's different objectives.
Keyword:
Project management
Compression
Time-cost trade-off
Nonlinear cost functions
Linearization
Mixed-integer linear programming
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.4W

机构

R
rider university
学者数:
159
论文数: 216
被引数: 2
引用论文

引用论文

err分享
err收藏
Anthropometric Measures in Adolescents With Inflammatory Bowel Disease: A Population-Based Study
err2018-10-24
err0
errOAAI
errItai Ghersin; Neron Khateeb; Lior H Katz; Saleh Daher; Raanan Shamir; Amit Assa
err分享
err收藏
Chemical and physical transformations in Ge-S-I glass preparation
err2012-03-14
err0
PREAI
errA. M. Kut’in; A. D. Plekhovich; A. P. Vel’muzhov; M. F. Churbanov
err分享
err收藏
NONLINEAR TIME COST TRADEOFF MODELS IN PROJECT-MANAGEMENT
err1995-04-01
err58
PREAI
errDECKRO, RF; HEBERT, JE; VERDINI, WA; GRIMSRUD, PH; VENKATESHWAR, S
err分享
err收藏
学者 查看更多内容