Project cost control using five dimensions building information modelling
DOI:10.1080/15623599.2021.1880313.png)
摘要
En 中文
Correctness level of data is the key of the construction industry success. Today, there is a novel widespread tool in construction sector which is building information modelling (BIM). BIM assists as a collective intelligence supply for data about a service and improves closeness among distinct stakeholder concerned in a project. The usual problems confronted by construction sector are cost increasing and schedule delays. BIM will certainly assist to reduce these circumstances. This article used a case study to show how the applying of BIM systems on a full construction project life cycle cost can decrease project budgets and enhance project time. Moreover, it is going to focus on integrating the traditional 4D BIM (project schedule) and the cost of every project item to form 5D BIM. This will simplify several cost associated actions such as controlling the construction project cost. At the end of this study, it is found out that the variance between planned costs and actual costs decreased from 12% to 5% when 5D BIM is used instead of traditional methods. Therefore, accurate cost estimates and clash finding are the useful outcomes of 5D BIM.
Keyword:
Construction projects
cost control
building information modelling
top management-5D
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
3.9
论文数:
2.8K
被引数:
4.6K
机构
引用论文
Effects of tDCS dose and electrode montage on regional cerebral blood flow and motor behavior
NeuroImage
IF0
Automated IFC-based building information modelling and extraction for supporting value analysis of buildings基于IFC的自动化建筑信息建模和提取,用于支持建筑物的价值分析
Efficient FPGA implementation of high speed digital delay for wideband beamforming using parallel architectures基于并行架构的高速数字延迟宽带波束形成的高效FPGA实现
没有更多内容