arrow
返回

Project-oriented task scheduling for mobile robot team

delete2009-01-09
delete13
PRE
AI
S
Servet Hasgül *
İ
İnci Sarıçiçek
M
Metin Özkan
O
Osman Parlaktuna
DOI:10.1007/s10845-008-0228-8delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This paper presents a project-oriented framework for multi-robot task scheduling. An agent-based architecture is designed to schedule tasks where robots are considered as resources. The study focused on the problems when the number of available robots is less than the required number. In this case, the problem becomes a resource-constrained scheduling problem. Initially, tasks are scheduled by using Critical path method (CPM), resource leveling method is used to smooth the deviation between the resource requirements and available resource levels, and tasks are allocated to robots. As robots perform their tasks, a monitoring agent observes them and tasks are rescheduled if the difference between the planned and actual completion time of tasks exceeds a predefined threshold. Effectiveness of the proposed approach is shown by using a nine-task two-robot project simulation.
Keyword:
Agent-based system
Multi-robot task scheduling
Resource leveling
Project scheduling

期刊

Journal of Intelligent Manufacturing 封面图
Journal of Intelligent Manufacturing
IF:
7.4
论文数:
3.5K
被引数:
1.1W

机构

E
Eskisehir Osmangazi University
学者数:
2.8K
论文数: 2.4K
被引数: 2
引用论文

引用论文

Electron-Impact Induced Fragmentation of Fullerene Ions电子碰撞诱导的富勒烯离子碎裂
err2000-10-23
err0
PREAI
errD. Hathiramani; K. Aichele; W. Arnold; K. Huber; E. Salzborn; P. Scheier
err分享
err收藏
没有更多内容