返回
Quantifying schedule risk in construction projects using Bayesian belief networks
DOI:10.1016/j.ijproman.2008.03.003.png)
摘要
En 中文
Delays on construction projects cause financial losses for project stakeholders in developing countries. This paper describes how Bayesian belief network (BBN) is applied to quantify the probability of construction project delays in a developing country. Sixteen factors were identified through a questionnaire survey of 166 professionals. Eighteen cause-effect relationships among these factors were obtained through expert interview survey to develop a belief network model. The validity of the proposed model is tested using two realistic case studies. The findings of the study revealed that financial difficulties of owners and contractors, contractor's inadequate experience, and shortage of materials are the main causes of delay on construction projects in Vietnam. The results encourage practitioners to benefit from the BBNs. This approach is general and, as such, it may be applied to other construction projects with minor modi. cations. (c) 2008 Elsevier Ltd and IPMA. All rights reserved.
Keyword:
Bayesian belief networks
Construction projects
Risk management
Scheduling
Delays
Vietnam
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.5
论文数:
2.6K
被引数:
1.2W
机构
引用论文
Habitat dependent nurse effects of the dwarf-shrubDryas octopetalaon alpine and arctic plant community structure
Écoscience
IF0

