The pursuit of Faster Fast Track or Flash Track is deemed necessary in today's industry for reasons such as emergency rebuilds, competitive market advantage, and regulatory compliance. Flash Tracking has been defined as a time-driven project, which by necessity requires a heightened degree of concurrency between engineering, procurement, and construction. This paper reports on Flash Track readiness assessment algorithms that were developed to enable an organization to assess its readiness to execute time-critical or Flash Track projects. The readiness assessment algorithms were developed by defining the relative importance of 47 essential Flash Track practices, grouped into 6 categories using the analytic hierarchy process (AHP). The weights of the practices and categories were determined by a 15-member industry expert panel, comprised of 15 Construction Industry Institute (CII) member companies representing owners, contractors, and engineering organizations. The algorithms were ultimately integrated into a Flash Track toolkit. In a validation exercise, representatives from 13 completed Flash Track projects used the toolkit with reference to their projects. Project representatives' retrospective self-assessment of readiness to perform the projects on a Flash Track basis were moderately to strongly correlated (r=0.76) with their readiness assessment forecasted by this research's algorithms. This research provides the first quantitative measurement suitable to assess an organization's readiness to undertake the unique challenges of a Flash Track project.
Keyword:
Fast track
Flash track
Analytic hierarchy process (AHP)
Project planning and design
Concurrent engineering
Design-construction integration
Project acceleration
Colocation
Relational contracting
Trust
Schedule-driven projects
Organizational issues
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

J
Journal of Construction Engineering and Management
IF:
5.1
论文数:
5.1K
被引数:
1.4W

机构

G
Georgia Institute of Technology
学者数:
1.8W
论文数: 1.4W
被引数: 5.9W
U
university system of georgia
学者数:
7.3W
论文数: 6.6W
被引数: 101
引用论文

引用论文

err分享
err收藏
Measuring Homework Compliance in Cognitive-Behavioral Therapy for Adolescent Depression
err2006-09-01
err0
PREAI
errScott T. Gaynor; P. Scott Lawrence; Rosemery O. Nelson-Gray
err分享
err收藏
学者 查看更多内容