This paper proposes a new method for the incorporation of the unit unavailability and the uncertainty of the load forecast in the solution of the short-term unit commitment problem. The above parameters are taken into account in order to assess the required spinning reserve capacity at each hour of the dispatch period, so as to maintain an acceptable reliability level. The unit commitment problem is solved by a simulated annealing algorithm resulting in near-optimal unit commitment solutions. The evaluation of the required spinning reserve capacity is performed by implementing reliability constraints, based on the expected unserved energy and loss of load probability indexes. In this way, the required spinning reserve capacity is effectively scheduled according to the desired reliability level. Numerical simulations have proven the efficiency of the proposed method.
Keyword:
probabilistic reserve assessment
reliability constraints
simulated annealing (SA)
unit commitment (UC)
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

IEEE Transactions on Power Systems 封面图
IEEE Transactions on Power Systems
IF:
7.2
论文数:
1.1W
被引数:
5.0W

机构

暂无机构信息
引用论文

引用论文

Contrasting Roles of DOP as a Source of Phosphorus and Energy for Marine Diazotrophs
err2022-07-25
err0
errOAAI
errAlba Filella; Lasse Riemann; France Van Wambeke; Elvira Pulido-Villena; Angela Vogts; Sophie Bonnet; Olivier Grosso; Julia M. Diaz; Solange Duhamel; Mar Benavides
err分享
err收藏
err分享
err收藏
Human erythroid porphobilinogen deaminase exists in 2 splice variants
err2001-02-01
err0
PREAI
errAlexander N. Gubin; Jeffery L. Miller
err分享
err收藏
学者 查看更多内容