Projects with repeating activities, such as multistory buildings and highways, present unique scheduling challenges. This paper presents the necessary requirements that scheduling systems should address to meet the needs and complexities of repetitive projects in practice. The repetitive scheduling method (RSM) provides a unified scheduling framework that applies to all types of repetitive projects. In RSM, projects are classified as discrete (vertical) or continuous (horizontal or linear) and then as uniform and nonuniform, depending on whether progress is measured using a counting scale or a dominant-attribute scale. RSM modeling elements include three types of activities (line, block, and bar) and 10 types of relationships (links) between activities. RP2, a computer program developed by the authors to validate the proposed scheduling approach, is used to develop the production diagrams and tabular reports of the target schedule for a complex of four-story apartment buildings for a low-income housing project. Sufficient detail is provided so that the project and its target schedule can be used to validate future research and to verify other systems. (C) 2016 American Society of Civil Engineers.
Keyword:
Planning
Scheduling
Repetitive project
Repeating activities
Repetitive scheduling method (RSM)
RP2
Line of balance (LOB)
Linear construction
Vertical construction
Horizontal construction
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
J
IF:
5.1
论文数:
5.1K
被引数:
1.4W
机构
引用论文
Addressing the COVID-19 Mental Health Crisis: A Perspective on Using Interdisciplinary Universal Interventions应对新型冠状病毒肺炎精神卫生危机: 跨学科普遍干预的视角
Measuring Heart Rate Variability in Free-Living Conditions Using Consumer-Grade Photoplethysmography: Validation Study使用消费级光电容积描记法测量自由生活条件下的心率变异性: 验证研究
Development and validation of a new method to quantify vitexin-2-O-rhamnoside on Passiflora L. extracts开发和验证量化西番莲提取物vitexin-2-O-rhamnoside的新方法
Weather Window Analysis in Operations and Maintenance Policies for Offshore Floating Multi-Purpose Platforms海上浮动多功能平台运维策略中的气象窗口分析